There were original timber deck boards that needed to be replaced after succumbing to pronounced mould, rot and general fibre decay. The existing subframe that supported the decking was also found to be in a degraded condition.
The phases of the project
- Remove and recycle (where possible) existing site materials
- Construct and embed new support frame
- Form decking surface with millboard around existing decorative steel structuresÂ